Ningbo Feiyu Logo

Supplier Verification

Supplier Verification & Manufacturing Confidence

Explore our manufacturing capabilities, quality approach and OEM production process before starting cooperation.

01 / Company Verification

Manufacturing scope at a glance

nbfeiyu is a family manufacturer in China with more than 23 years of OEM and ODM experience. Its 20 production lines support project work from product concept through mass production.

Core manufacturing capabilities include CNC machining, laser cutting, tube laser cutting, wire EDM, welding and assembly. Projects can be reviewed around aluminum, steel, PP plastic and brass component requirements.

Review manufacturing capabilities

02 / Quality System

Quality review before production

nbfeiyu operates 20 production lines under an ISO 9001 quality management system. Incoming material inspection, in-process controls and final inspection are planned around the agreed manufacturing requirements.

First article inspection and inspection planning can be incorporated into the project review. During qualification discussions, buyers can identify their documentation and traceability requirements. nbfeiyu confirms what can be reviewed case by case for the agreed scope.

Review quality-control approach

03 / Engineering Evidence

Engineering support for reviewable decisions

Engineering support includes DFM review, prototype development, CAD/CAM review and inspection planning. During the DFM review, buyers can identify their required manufacturing processes for review against the available product information before production begins.

Buyers can use the OEM and ODM workflow to frame the project stage, available drawings or specifications, required manufacturing processes and quality requirements for the initial review.

Review OEM and ODM workflow

04 / Factory Audit

Factory audit support

Send the proposed audit scope, product context, required processes, quality requirements and preferred review format in advance. nbfeiyu uses that information to coordinate the relevant production and quality teams.

  1. 1. Audit scope received: confirm the intended manufacturing, engineering and quality topics.
  2. 2. Team coordination: prepare the relevant production and quality contacts for the agreed scope.
  3. 3. Document availability review: identify applicable documentation for the planned review.
  4. 4. Agenda confirmation: align an on-site or remote agenda before the audit.
  5. 5. Corrective-action follow-up: record agreed follow-up items after the review.
Request Factory Audit

05 / Factory Visit

Plan a factory visit

A factory visit can be planned around the product scope and the areas a buyer needs to review. Share the intended purpose and preferred timing so nbfeiyu can confirm the appropriate agenda.

  1. 1. Request: share the visit purpose, product context and preferred timing.
  2. 2. Confirmation: confirm the visit format, attendees and practical arrangements.
  3. 3. Visit agenda: align the production areas and review topics in advance.
  4. 4. Production and quality review: review the agreed manufacturing and quality-control topics during the visit.
  5. 5. Follow-up: document the agreed next steps after the visit.
Schedule a Factory Visit

06 / Documentation

Verification links and project context

Use these existing pages to prepare manufacturing, quality and project questions before an audit, visit or RFQ discussion.

07 / Evidence Policy

Evidence with confirmed provenance

nbfeiyu publishes customer identities, project outcomes, certificates and photographs only when their provenance and disclosure status are confirmed. This page does not replace an audit, a visit or a project-specific engineering review.

What information should a buyer provide before a factory audit?

Before a factory audit, share the product scope, required processes, relevant quality requirements, the audit focus, preferred format, and the proposed agenda so nbfeiyu can coordinate the appropriate production and quality teams and prepare applicable documentation for review.

What can a buyer review during a factory visit?

During a factory visit, a buyer can review the agreed production areas, relevant quality controls, engineering and manufacturing workflow, available documentation, and the planned follow-up items within the confirmed visit agenda.

Can a factory audit or visit be requested before an RFQ is finalized?

Yes. A buyer can request a factory audit or schedule a factory visit before an RFQ is finalized. Share the available project context and intended review scope so nbfeiyu can confirm the appropriate next step.

Next Step

Start the right qualification conversation

Dispatch verification

Packaging and shipment evidence

The following owner-supplied media records packaging and loading activity. It is provided as review context; product, packaging and shipment scope remain project-specific and should be confirmed before approval.

Loading activity recorded for dispatch review.
Owner-supplied container loading scene
Container loading scene.
Owner-supplied packed cartons in a shipping container
Packed cartons prepared for dispatch.