This article focuses only on drawing review. It supports the broader RFQ review article by explaining what engineers check inside the drawing before pricing.

Geometry And Machining Access

Tolerances And Datums

Material And Finish Notes

Inspection Requirements

  • Critical dimensions, CMM requirements, FAI reports and customer-specific inspection standards should be clear before quotation.
  • For the larger RFQ review process, read what happens inside a factory after you send an RFQ.

    Next Step

    Send drawings with tolerances, material and finish notes for engineering review.

    Contact NBFEIYU or use the OEM/ODM RFQ checklist to prepare your project information.

    Quick Answer

    The practical answer depends on the part function, material, quantity, tolerance, finishing and inspection requirements. A factory review before production helps convert those requirements into a controlled process.

    Buyer Checklist

    FAQ

    What should buyers send for review?

    Send drawings, models, material details, quantity, finish and any inspection or packaging requirements.

    Why involve the factory before production?

    Early review can identify process, fit, finishing, inspection and delivery risks while changes are still manageable.